Together with the walls, the installation of jumpers are installed. In places of openings, reinforcement is carried out, and then all this is poured with concrete. Monolith belts are also poured with concrete.
Together with the walls, the installation of jumpers are installed. In places of openings, reinforcement is carried out, and then all this is poured with concrete. Monolith belts are also poured with concrete.