At the next stage, a special embankment is organized. From what features the place of the future building will have, crushed stone, reinforced concrete pipes and sand will be required to perform the embankment. Pipes are needed to drain groundwater. We should not forget that the embankment gives a shrinkage, which means that before the completion of construction work, lay asphalt or other coating is not recommended.