— Nails No. 200.
— Log or timber.
— Plumb.
— Tes.
— The level is laser.
After the walls are erected, when working with a ceiling overlap, it is necessary to release beams, a little further than the level of the end of the wall. These released beams should be nailed using tes nails. When the overlap is built, you need to start installing the rafters. They can be made of a skinny dry log or a bar. The first rafters should be installed in the middle, and their upper part should be sawn down along the corner of the inclination of the entire roof. Recently, roofing work has been often carried out more about them will not be superfluous to find out.