Waterproofing strips are installed between the ceiling beams and are fixed on the sides of the beams themselves. After that, the foam is cut and laid in the space between the beams. In this case, the stripes should enter with sufficient density so as not to fall out of the cell in the future. The distance between the foam slabs is allowed no more than one centimeter. In the future, these gaps are filled with mounting foam.