Laying asphalt is a time -consuming process that takes quite a lot of time.
The first stage is the preparation of the site. The upper (fertile) layer of soil is selected, then with the upper layer of soil (loam) the astringent composition is mixed — lime, cement or bitumen, after which the site is compacted.