Results of the meeting of the Committee on Engineering and Technical Supply Systems
The Committee on Engineering and Technical Support systems and buildings held the next meeting, many pressing issues were considered on the agenda. The priority issue was the technical aspects of ensuring the required security when performing various work, such as the installation of windows, elevator shafts, delivery and acceptance of work. Separate points included references to a specific technology for installing windows in buildings. Separate mention of installation and laying of the pipeline system, sewage, installation of fire safety system at the required facility were awarded to the technologies. A group of experts coordinated all the work performed, which allows us to draw certain conclusions about their quality. The standards developed are suitable and applicable in various situations and conditions. Some points concerned the features of the installation and design of engineering networks.