Pile work makes it possible to significantly reduce labor costs in the implementation of soil processing, as well as in the conditions of the zero cycle, which is understood as the preparation of the site for the construction, laying of communications, the construction of ceilings/walls to the mark “0.00 «and pr. If, instead of the device of the usual fundamental base of the tape type, work was selected to packet or immersed piles into weak soils, in this case it will be possible to minimize the volume of work of the zero cycle up to about 85%. It is worth noting that the construction of the foundation in which (in order to transmit the load from building to soil) are used pointed pillars, sometimes it is the only possible option.