After the fasteners of sheets, the joints are opened with a cromic shirt, so that the plaster is better grasped when clinging.
Further, the surface of the sheets is treated with soil to ensure the fastening of subsequent materials applied to drywall. The joints are sealed with a special mixture, then a reinforcing tape is laid and the final putty of the ceiling surface is made.