3. Removal of degreasing composition.
4. The priming of the surface of the bathroom and the application of the first layer of enamel.
5. Applying the second layer of enamel, the final stage.
3. Removal of degreasing composition.
4. The priming of the surface of the bathroom and the application of the first layer of enamel.
5. Applying the second layer of enamel, the final stage.